Related Projects of Embankment (Land, River Development)

Projects List

TS-Topographic Survey, ST-Soil Test, A-Architectural Plan, D-Detail Design, E/M-Electro-Mechanical Design, E/T-Estimate & Tendering, S-Supervision

Sl. No.

Name of Project

 

Name of Client

Brief Description of Project

 

Service

Project Cost

Completion

Date

Remark

 

01

 

Consultancy Services Preparation of Design & Drawing, Tender Document and Supervision of land Development, Embankment, Earth/ Bank Protection and other related Civil work of the Project “Land Acquisition and land Development for Implementation of GAZARIA 350 (+ 10%) MW Coal- Fired Thermal Power Plant at Gazaria Munshiganj- District.

 

 

Rural Power Company Limited (RPCL) / GOB.

 

A) Land Development by Dredging Sand, Land Area= 289.0 Acre, Volume of Sand Filling 64,32,487.0 cum

 

B) Embankment Length= 7.301KM.

 

Earth Protection CC Block, Geo- Textile work etc.

TS, ST, A, D, E/M, E/T, S

 

 

Tk. 132.0 Crores.

 

 

 

 

Tk. 248.55 Crores.

 

On- going

 

02

 

Land Development for 400MW Combined Cycle Power Plant Bibiyana – III, under Bangladesh Power Development Board at Moulavi Bazar.

 

 

Bangladesh Power Development Board (BPDB).

 

 

Land Development & Compaction by DVD- Method Filling height= about 5.0M

 

TS, ST, A, D, E/M, E/T, S

 

 

 

Completed

 

03

 

Earth- Embankment with Bank Protection work under Construction of Infrastructure  Facilities on evicted for shore land at Dhaka, Nayrangonj & Tongi- Port Area.

 

Bangladesh Inland Water Transport Authority (BIWTA.

 

A) Earth- Embankment (13.5KM with (3m- 4m height).

 

B) Bank/ earth protection (CC Block, Geo- Textile) Length 11.62 KM

 

TS, ST, A, D, E/M, E/T, S

 

 

Tk. 110.0 Crores.

Dec- 2012

 

 

04

 

Earth- Embankment with Earth Protection work under Construction of Infrastructure along Evicted for Shore Land at Ramchandrapur, Kamrangirchar, Basila, Pagla, Narayangonj Mukterpur, Tongi, area of River Buriganga, Tongi, Balu & Sitalakhya (1st – Phase).

 

 

Bangladesh Inland Transport Authority (BIWTA)

 

A) Earth Embankment (about 45.0KM) Filling height (3m to 4.0M)

 

B) Earth Protection about 35.0 Km with CC Block, Geo- Textile etc.

TS, ST, A, D, E/M, E/T, S

 

 

Tk. 600.0 Crores

June 2016 (Design)

 

Construction going on.

 

05

 

Land- Development, Bank Protection & Dredging work at Nagar Bari River Port under “Establishment of River- Port with allied Facilities at Nagarbari BIWTA.

 

 

Bangladesh Inland water Transport Authority (BIWTA).

 

A) Land- Development of 40.0 Acre  Land (height 3.5m), Volume- 5.70 Lakh cum.

 

B) Bank Protection

TS, ST, A, D, E/M, E/T, S

 

 

Tk. 99.84 Crores

 

 

Tk. 39.48 Crores.

 

 

06

Circular Water way Around Dhaka City from ( 1st Phase), Improvement of Narigabilily and Providing Landing Facilities from Swarighat to Ashulia including River Dredging, Amin Bazar to Ashulia Bridge (Buriganga- Turage River) (BIWTA).

 

Bangladesh Inland water Transport Authority (BIWTA).

River Dredging from Amin Bazar to Ashulia Bridge (Buriganga- Turage River)

TS, ST, A, D, E/M, E/T, S

 

Tk. 42.00 Crores

March - 2002

 

07

Embankment & River Bank Protection by CC Block & Geo- Textile for Construction of Teesta Bridge (L= 1490.0m) at Gaibandha- District.

LGED

A) Embankment Both Side of River up- stream & Down Stream (L=4.0 KM)

 

B) River- Bank Protection by Geo- Textile & CC Block.

TS, ST, A, D, E/M, E/T, S

Tk. 75.0 Croes

 

On going.



Some Embankment (Land, River Development) individual projects

-------------------------------------------------------------------------------